Currently all high-speed rail systems require electrification (alternate current / direct current systems) due to the great demand throughout the power grid.
An electrification system requires careful planning, not only in terms of mechanical trades, but also for its visual impact on the environment and signaling issues.
Through infographics can be obtained the final image in advance, used to judge the visual impact caused by the change in the landscape.
Landscape image BEFORE electrification project
Landscape image AFTER electrification project (inphographic)